Boomvang Riser Work Completed

Boomvang Riser InterMoor

InterMoor was recently part of a team that disconnected and laid down 3 risers and 1 umbilical off the Boomvang spar. The Boomvang spar continues to produce today after achieving first production in 2002 in East Breaks Block 643 in the Gulf of Mexico.

An InterMoor crew of about a dozen, working together with a separate team on board the spar, successfully completed the scope of work from an anchor-handling vessel in 3,472 ft. of water.

InterMoor Blog

Get in Contact

  • This field is for validation purposes and should be left unchanged.