transponder buckets being fabricated Transponder buckets used on the top of each pile to house transponders to verify installation accuracy.

 

  • The piles for the Heidelberg project have shipped from our facility in Morgan City, La.
  • There are 9 piles for flow line and riser holdback.
  • Piles are 12′-9″ diameter and 65′ long.
  • Design weight is 139,234 lbs each (about 63 tonnes).
  • Field development is located in Green Canyon 859 of the Gulf of Mexico